Which model each app runs today, and when it last changed

Retirement date: the day a model stops answering

A retirement date is the day access ends. Three things have to be read alongside it: whether it can move, whether it is stated as the earliest possible day rather than the day, and which surface it covers, because a consumer product and an interface can close months apart. As of 2026-09-22.

What a reader has to establish before a date is usable. Recorded 2026-09-22.
Question about the dateWhy it changes the plan
Can it be pushed backAn extension turns urgency into wasted work
Is it the earliest or the actual dayA floor cannot be scheduled against
Which surface does it coverAn interface may close after a product does
Is a successor named beside itA runway leading nowhere cannot be spent

Inclusion rule. Questions this register asks of any dated row before recording it. A date without these answers is still recorded, with the wording kept verbatim. Order. In the order that changes a plan most.

1Two dates for one model is normal

The one completed retirement in this register closed a consumer product about five months before it closed the interface behind it. Both dates were in the same notice and only one of them was quoted widely.

So the first question about any date is which surface it applies to. A team calling an interface and a person using an app got very different amounts of warning from the same announcement.

2A date can be a floor

One maker in this register describes its shutdown dates as the earliest a model might be retired. That makes each one a lower bound, so work can be scheduled up to it and nothing guarantees the model stops there.

Read as a deadline, a floor produces a migration finished early and possibly wasted. Read as published, it produces a migration held ready. The wording decides which, so it is worth keeping verbatim.

Three questions before a date is usableWhether it can move, whether it is the earliest possible day rather than the day, and which surface it covers. All three change the plan, and in this register each one has a different answer on a different entry.Which surfaceA consumer productand an interface canclose months apart.Then askFixed or floorNon-extendable, orstated as theearliest a modelmight go.Then askSuccessor namedA runway leadingnowhere cannot bespent on testing.A date recorded without these answers is still recorded, with the wording verbatimTwo of the three questions have opposite answers on two platforms in this register.
Fig. 1 The one completed closure here gave two dates in one notice, five months apart, for two surfaces.

3A date with no destination is half the information

Stopping on time is arithmetic. Choosing what to move to and re-establishing a look on it is the expensive part, and a notice that names no successor leaves that entirely with the customer.

One entry in this register names a successor in a dated row. Everywhere else the date arrives alone, which is why succession is kept as its own column.

A definition rather than a dated entry: no line above is a vendor statement. Where this word turns up in a real notice, the wording and the date are on the change calendar. Nearby terms: Shutdown, End-of-life, Legacy period.