Ending early: how access stops before a date
Access can stop before the date on the page. Amazon Bedrock states that an existing customer may lose access after fifteen days of inactivity once a legacy period begins, LTX Studio reserves the right to replace models at any time, and Microsoft Foundry states only that a date cannot be pushed back. As of 2026-09-12.
| Entry | Ending early | What that leaves a production with |
|---|---|---|
| Amazon Bedrock | Access may end after 15 days of inactivity | Inside the legacy window, before the date |
| Microsoft Foundry | Dates are not extendable | The date can only arrive, never move later |
| Gemini API | The published date is the earliest possible one | So the date is a floor and can move later |
| LTX Studio | Models may be replaced at any time | No date to be early against in the first place |
| Runway | Not stated, and the credit table can change | A conversion rate is edited, not announced |
| Every other entry | Nothing published | A menu line can be edited without a notice |
Inclusion rule. A cell is filled from a published sentence about access ending other than on a stated date. A reader's guess about how quickly a menu could change does not fill one. Order. Entries publishing something about early loss of access first, then the rest.
1The date is a ceiling, and sometimes not even that
Planning treats a published date as the moment work has to stop, which makes it feel like a floor as well as a ceiling. Two entries here say otherwise in opposite directions: one says the date cannot be pushed back, another says its dates are the earliest a model might go.
Those two sentences look similar and mean opposite things. One removes the hope of an extension, the other admits the date may quietly become later, and a production that read both as the same kind of commitment would plan two migrations wrong.
2Disuse is the clause nobody expects
The sharpest sentence in this column is about inactivity rather than about dates. Once a legacy period begins, an existing customer can lose access after fifteen days of not calling the model, which turns a six-month window into a fortnight for anybody between projects.
That is exactly the shape of a serial production: heavy use while an episode block is in flight, then weeks of writing. A team that stopped calling a model to finish a script can come back to find the window it was counting on already spent.
3Where nothing is published, a menu edit is the mechanism
For the entries with an empty cell there is no clause to read, and the way access ends is simply that a line disappears from a priced page. No date precedes it and no notice follows it, so the event is only visible to somebody comparing two readings.
This is the column where an absence is most expensive, because the other columns at least describe a future. Here the blank says the ending has no announced shape, and a plan that assumes a runway has assumed something nobody offered.
4This column, entry by entry
The ending early column read one entry at a time, wherever that entry has published something here or falls silent in a way the others do not. Ordinary blanks stay on the table above.
- Amazon Bedrock — fifteen days of inactivity can end access inside a window measured in months
- Microsoft Foundry — a date that cannot be pushed back, which removes an exception people expect to negotiate
- Gemini API — a date described as the earliest, so it is a floor that can quietly become later
- LTX Studio — a right to replace at any time, which leaves no date for anything to be early against
- Runway — a conversion table can be edited, which ends access with no date and no notice
- Adobe Firefly — a tier restructure ends access with nothing retired and no lifecycle page involved
- PixVerse — a promoted version with no predecessor named, so a line can vanish with nothing to compare
- How access can end before the dateOnce the Legacy period begins, existing customers may lose access after 15 days of inactivity
- Whether a date can be pushed back on requestRetirement dates are not extendable
- What a date in that table commits toThe shutdown dates listed indicate the earliest possible dates on which a model might be retired
- Published noticeThe pricing page reserves the right to update, modify or replace available models and does not guarantee continued availability of any specific modelthe only one of its kind here
- Notice before the credit table changesNo date announced (as of 2026-09-12)nothing published
5Sources
Values come from the page the entry is read on: vendor announcements for endings, app pages for menus, both linked from the calendar. What counts as a value is on sourcing. Read 2026-09-12. Other fields: Named replacement, Stored work. All of them: the field list.